T'Art Holding

Kunming Reservoir Drainage and Drainage Project

Thông tin chi tiết dự án

In April 2021, Yunnan Yuntianhua Group Kunming Reservoir Flood Ditch Project. The construction site has a high elevation and slope, large-scale machinery cannot operate, the foundation is mostly graded, the soil layer along the ditch is easy to slip.

TOP